Skip to content
ZalTech — AI for engineering

AI for engineering · GCC

AI does the first pass. Your engineers make the call.

We help consultants, contractors and asset owners put AI to work: ready-made review tools built on the standards each project stage works to, and custom AI built into your own workflows. Every finding is traced to its evidence and signed off by a qualified engineer.

  • Built on the rulebook for each stage
  • Every finding traced to its evidence
  • Arabic and English

Services

Custom AI for engineering firms

Three fixed packages, scoped up front, for consultants, contractors and owners who want AI in their own workflows.

  • AI Readiness Review

    A structured look at where AI can safely help your engineering workflows, and where it should not.

    Includes

    • Working sessions with your engineering leads
    • Review of workflows, documents and data
    • Shortlisted use cases with risk notes
    • A phased, practical roadmap
    Deliverable
    Readiness report and prioritised roadmap
    Price
    Pricing on request
  • Workflow Automation

    Automate one defined, repetitive engineering workflow, such as registers, transmittals, checklists or report assembly, with engineer review built in.

    Includes

    • Mapping of the current process
    • Build and integration with your tools
    • Engineer review checkpoints
    • Handover and team training
    Deliverable
    A working automated workflow, documented
    Price
    Pricing on request
  • Custom Tool Build

    A review tool built on your standards and project data, using the same engine as our products.

    Includes

    • Requirements and rulebook capture
    • Prototype on your own documents
    • Iteration with your engineers
    • Deployment and support
    Deliverable
    A deployed tool with engineer sign-off built in
    Price
    Pricing on request

Products

Five review tools. One engine.

Each tool checks one stage of a project against its rulebook. Every finding is located on a sheet or photo, linked to a clause, and left for a qualified engineer to accept or reject.

Show me what fits

Five review tools across the project life. Choose your role to see where we fit.

01LiveDesignRelevant to you

FirstPass AD

AI pre-submission review of Abu Dhabi infrastructure drawing packages for IDAS: the comments a reviewer is likely to raise, document and cross-sheet checks, and applicable clauses screened, each on the sheet it came from, for your engineer to decide.

Who it’s for

  • Design consultants preparing IDAS infrastructure submissions
  • Design managers and checking engineers

Key outputs

  • Pre-Review Report (PDF)
  • Cross-Check Register (XLSX)
  • Comments pinned to their sheets
  • Revision check against the previous issue

Illustrative interface · sample data

02LiveDesignRelevant to you

RoadSafe AD

AI-assisted first-pass Road Safety Audits to Abu Dhabi TR-540: drawings, site photos and satellite imagery in; located, risk-rated findings, the RSA report and the Decision Tracking Form out; auditor sign-off.

Who it’s for

  • Road safety auditors and audit team leaders
  • Design consultants commissioning RSAs

Key outputs

  • Located findings, risk-rated Low, Medium or High
  • RSA report for auditor sign-off
  • Decision Tracking Form (XLSX)
  • Located evidence crop for each finding

Illustrative interface · sample data

03PilotDesignRelevant to you

CapitalLens AD

AI-assisted quantity takeoff from infrastructure drawings: CapitalLens AD reads and measures each vector sheet and proposes every quantity, marked on the sheet, for your quantity surveyor to confirm, correct or add. Only confirmed quantities become the bill of quantities, priced from indicative rate ranges and reviewed line by line.

Who it’s for

  • Quantity surveyors and cost managers
  • Asset owners and developers estimating capital projects

Key outputs

  • Quantities marked on each sheet
  • Bill of quantities traced to its drawings
  • Indicative rates with a low, likely and high
  • Excel with live formulas and a PDF report

Illustrative interface · sample data

04PilotConstructionRelevant to you

Mutabaqa

AI review of construction submittals against the project specification: every clause read, each requirement matched to the evidence in the package, and what does not match or is missing set out with the document and page it rests on.

Who it’s for

  • Contractors' technical offices and suppliers
  • Supervision consultants reviewing submittals

Key outputs

  • Readiness report, top issues first
  • Compliance matrix with document and page
  • Fix list for the technical office
  • Draft statement of compliance

Illustrative interface · sample data

05PilotOperationRelevant to you

StructureCert

Bridge inspection intelligence: photographed in one visit, StructureCert's AI names and boxes every defect, condition is rated by a signed method with the FHWA NBI 0–9 rating beside it, and repairs are priced and ranked. The engineer of record reviews what the AI cannot settle and signs the report.

Who it’s for

  • Asset owners and maintenance departments
  • Developers managing portfolios of structures

Key outputs

  • Signed inspection report (PDF)
  • Condition ratings, with the FHWA NBI 0–9 rating
  • Defect register by element, with photos
  • Repairs priced and ranked, in an Excel tracker

Illustrative interface · sample data

Share a problem

Have an engineering problem AI should solve?

Tell us about the check, the register or the report that eats your team’s week. It takes about three minutes, and you can stay anonymous.

Share your problem
  1. 01Your context
  2. 02The problem
  3. 03Contact, if you want a reply

Built on

  • TR-series
  • IDAS
  • QCC
  • MASH
  • FHWA NBI
  • AASHTO MBEI

Standards are named to show what our tools check against. This implies no approval, endorsement or partnership with any authority.

Process

How a review works

The AI never has the last word. It does the first pass so your engineers can spend their time on judgement.

  1. 01

    1. Upload

    Drawings, photos, specifications, imagery or inspection notes.

  2. 02

    2. Check against the rulebook

    Each item is checked against the applicable standard, specification or checklist.

  3. 03

    3. Evidence-linked findings

    Every finding is located on a sheet or photo and tied to a clause.

  4. 04

    4. Engineer sign-off

    A qualified engineer accepts, edits or rejects each finding.

  5. 05

    5. Authority-ready report

    Signed-off findings go into a report formatted for submission.

Principles

  • Traceable

    Every finding points to a sheet or photo and to the clause behind it. A finding that cannot be traced is not reported.

  • Accountable

    The AI assists. A qualified engineer reviews and signs off, and professional responsibility stays with the engineer.

  • Local

    Built in Abu Dhabi by an engineer who has worked to GCC standards for two decades.

Contact

See a review on your own drawings

Book a demo of a product, or talk through a service package. We’ll show you the findings, the evidence and the sign-off step.